Sunday, July 22, 2012

Boeing Delivers 2nd Production P-8A Poseidon Aircraft to US Navy


Boeing on July 17 delivered the second production P-8A Poseidon aircraft to the U.S. Navy. The P-8A is one of 13 low rate initial production (LRIP) maritime patrol aircraft that Boeing is building for the Navy as part of two contracts awarded in 2011. Navy pilots flew the P-8A from Seattle to Naval Air Station Jacksonville, Fla., where the first LRIP P-8A is being used for aircrew training.

"We're proud to be able to meet our commitment and deliver another Poseidon to the fleet," said Chuck Dabundo, Boeing vice president and P-8 program manager. "Navy crews have had a couple of months of training with the first plane, and their feedback has been positive."
     
Boeing on July 17 delivered the second production P-8A Poseidon aircraft to the U.S. Navy. The P-8A is one of 13 low rate initial production (LRIP) maritime patrol aircraft that Boeing is building for the Navy as part of two contracts awarded in 2011. Navy pilots flew the P-8A from Seattle to Naval Air Station Jacksonville, Fla., where the first LRIP P-8A is being used for aircrew training.
(Picture: Boeing)
     
Three P-8As currently are undergoing mission systems installation and checkout in Seattle, and three are in final assembly in Renton, Wash. In order to efficiently design and build P-8A aircraft for the Navy and P-8I aircraft for India, the Boeing-led team is using a first-in-industry, in-line production process that draws on the company's Next-Generation 737 production system. All aircraft modifications are made in sequence during fabrication and assembly.


 Read More................. 

No comments:

Post a Comment